M2.3 – Point 12 During a HRSTS discharge event, the daily salt load limit was exceeded. The daily salt load limit was 36.7t which Mangoola discharged 40.6t. During the same event, the EC was recorded as an average of 4777 µS/cm exceeding 4750 µS/cm requirement for d EPA action determined as part of scheduled inspection program 1
M2.3 – Point 12 During a HRSTS discharge event, the daily volume discharge limit was exceeded. The daily volume discharge limit was 0.0ML which Mangoola discharged 0.3 ML of water. The daily salt load limit was 0.0t which Mangoola discharged 0.7t. EPA action determined as part of scheduled inspection program 1
M2.3 – Point 12 During a HRSTS discharge event, the daily volume discharge limit was exceeded. The daily volume discharge limit was 0.0ML which Mangoola discharged 0.04 ML of water. The daily salt load limit was 0.0t which Mangoola discharged 0.1t. EPA action determined as part of scheduled inspection program 1
M2.3 – Point 12 During a HRSTS discharge event, the daily salt load limit was exceeded. The daily salt load limit was 4.4t which Mangoola discharged 4.7t. EPA action determined as part of scheduled inspection program 1
M2.3 – Point 12 During a HRSTS discharge event, the daily salt load limit was exceeded. The daily salt load limit was 139.7t which Mangoola discharged 150.1t. EPA action determined as part of scheduled inspection program 1
M2.2 – Monitoring Po Failure to continuously monitor PM10 concentration at Monitoring Point 20 due to breakdowns and maintenance. EPA action determined as part of scheduled inspection program 3
M4.1 – Monitoring Po Failure to continuously monitor meterological parameters at Monitoring Point 5 due to technical faults, routine maintenance and reasons outside foreseeable control of Mangoola Coal Operations. EPA action determined as part of scheduled inspection program 10
M4.1 – Monitoring Po Failure to continuously monitor meteorological parameters at Monitoring Point 18 due to technical faults, routine maintenance and reasons outside foreseeable control of Mangoola Coal Operations. EPA action determined as part of scheduled inspection program 25